01A mushroom farm built the system to scale. Read the engagement →Show less
A 2.5-year operating reset brought cGMP readiness, ERP traceability, lean workflows, and GTM support into one system. Output tripled while contamination and labor friction fell.MUSHROOM FARM3X THROUGHPUT
The situation
A farm was pursuing higher capacity, cGMP readiness, stronger workflows, and a full brand relaunch at once. Material organization, training, quality documentation, contamination control, and manual systems were holding each other back.
The work
Built a cGMP-ready operating system: lean workflows, MMRs, MBRs, SOPs, QMFs, HACCP and HARPC plans, supplier approval, ERP traceability, cross-team training, and GTM coordination.
What changed
Output capacity tripled. Contamination fell, automation reduced labor hours, sales rose 18% year over year during the engagement, and the operation was ready for a cGMP audit.